constructions

Since 1999, Waas Gramser and Kris van Trier have been performing almost exclusively in the open air. Since that time, in addition to the translation and adaptation of classic plays and other writings, a sort of parallel course has developed involving the building of mobile constructions.
Two seating blocks have been built for tours (2001 & 2008), an open-air library (2010) and a mobile container construction (2013) that provides a workplace for the company.

marius mobile

Construction year: 2013

Design: H&H architects in collaboration with Comp.Marius
Men at work: Comp.Marius, Van Doorn container depot, Fen Van Trier
Production: Comp.Marius
Finance: Comp.Marius, Antwerp city council
In residence at: Middelheim Museum

Read more...

summer library

Construction date: 2010

Designed by Koen Schetske with Waas Gramser and Kris Van Trier
Adaptations 2013: Koen Schetske with Waas Gramser, Kris Van Trier
Woodwork: Koen Schetske, Tidian N’dongo, Max Van Essche
Ironwork: Moker
Funding: Comp.Marius in association with Zomer van Antwerpen

Read more...

tribune 2008

Construction: 2008

Design: Koen Schetske in collaboration with Waas Gramser and Kris Van Trier
Engineering firm: Vinçotte
Wooden construction: Koen Schetske, Stevie Van Haver
Iron construction: Moker
Funding: Comp.Marius

Read more...

tribune 2001

Construction: 2001

Design: Koen Schetske in collaboration with Waas Gramser and Kris Van Trier
Engineering firm: Timber Engineering
Wooden construction: Koen Schetske, Kris Van Trier, Ravelin Cielen and Waas Gramser
Iron construction: Moker
Funding: de Onderneming (now Comp.Marius)

Read more...

addendum

Never completed:

DE BARAK

Design: Koen Schetske in collaboration with Waas Gramser and Kris Van Trier
Engineers: Patrick Bouchain and Daniel Sour
Preliminary studies: 2005-2006
Co-construction: Marius & cie, Lieu Unique Nantes (FR)

Read more...